The customer’s team, together with GENCON’s technical, electrical, and QC engineers, conducted a detailed inspection of the Wet Scrubber System (Capacity: 500 CMH) to ensure that all equipment operates according to design specifications. This pre-installation inspection aims to verify system performance, ensure readiness, and minimize installation time and potential issues during on-site assembly and commissioning.
GENCON would like to express our sincere appreciation to the customer’s team for their cooperation and valuable technical feedback during this inspection.
Your contribution plays an important role in ensuring accuracy and completeness during the on-site installation phase.